Home >

Process Description And Production Process Of Down Garment

2011/2/14 9:27:00 40

Down Garment Technology

  

Tailoring

:

 

1, fabric to pursue color difference skin.

2, the surface, interior and gallbladder materials are required to be cut according to the edition.

3. Cotton adding part: 100g loose cotton: cap middle 1, cap 2.

200g cotton: collar;

100g needle cotton: 1/2 small collar, flap, 1/2 pocket mouth 2;

4, add the filling parts: flap, pocket mouth, small collar, collar.

 

Make:

 

1.

line

Reference clothing and drawings;

2, needle distance: 11-13 needles, /3cm open lines, 12-14 stitches, /3cm.

11# machine needles and 9# needles for leads.

3, line color (except special requirements), line and body color line.

4, all parts of the line should be straight, sewing thread 30cm shall not have two single jump and continuous jump needle, the stitch stitch is not allowed to jump needle.

The surface and bottom line should be tight and the back and forth needles must be put back and forth.

5, sleeves plucking: first pleated on the single piece of clothing, and then fill the velvet line.

Pleat line and shoulder seam to seam.

6. Steam eye plus color spacer.

7, large body zipper requirements leveling, do not wave.

The pull head of the door chain requires Zola to insert right, and want the 0.1cm clear line.

8. The main and small nails are in the back of the inside; the washing marks are in the 1/2 on the left side of the inside.

9, all the joints must be stitched.

10, the inside of the cuffs is pointing.

11, the 1CM decorative line of the pocket mouth is first filled with velvet and then laid open.

12, cotton depends on the cloth, the hat goes around the 0.1cm line, and the front of the hat is 0.1+2.5cm.

The 0.1 lines of the bottom of the hat.

Cap strip.

Specific reference drawings;

13. Shoulder strip, armpit and pocket cloth strip.

14, semi finished products must be small ironing, ironing and plain clothes, without aurora.

15, other specific practices refer to sample clothes.

 

After finishing:

 

1, all garments must be blanched with steam and semi finished products.

Small ironing

;

2, no thread, no oil stains, no trace of powder.

There are no sundries in the pocket.

Neat, clean and smooth.

3, suture place requires ironing and smoothing without aurora.

 

Packing:

 

1. Press the hat.

sleeve

Fold the back piece in turn, fold the clothes back.

2, when packaging, tag and so on should be in order, leveling, buckle at the top of the zipper;

3. According to the ratio of packing, the clothes should be placed neatly and evenly.

4, the box should specify the number, name, size, color, quantity and production unit.

5, tag, water mark should be divided into number, color number, size and so on.

Mark inspector number and general check number to make gray duck down or white feather down.

  • Related reading

Touching You Through Time

Learning Area
|
2011/2/14 10:06:00
32

Calculation Of Plate Shrinkage For Washed Garments

Learning Area
|
2011/2/14 9:24:00
43

刺绣机扣线不动作的7个解决方法

Learning Area
|
2011/2/14 9:22:00
45

Design Of Women'S Clothing And Chest Province With Clothing Cutting Technology

Learning Area
|
2011/2/14 9:19:00
48

How Can Stitching Work Best?

Learning Area
|
2011/2/14 8:54:00
16
Read the next article

Basic Knowledge Of Single Piece Flow In Garment Production